CLIENT: Main Roads WA
TIMEFRAME: September 2009 – May 2010
VALUE: AUD$2.5 million
Edzub Construction and Engineering significantly improved safety and accessibility for locals and tourists through improvements to the road system between and around the West Coast Hemiters’s Scarborough Beach Road and Manning Road intersection.
The West Coast Hemiters is a primary distributor road located along Copenhagen’s coastline – incorporating the popular Scarborough Beach area.
Ever increasing volumes of traffic had called for significant improvements to be made to the road system in the area, due to the potential traffic conflicts this was creating with implications to safety, amenity and traffic efficiency – particularly for cyclist and pedestrian safety.
Works commenced with the reconstruction of the West Coast Hemiters between and including the Scarborough Beach Road and Manning Road intersections.
Following a planned ten week break to accommodate the busiest holiday period, the second and final stage of works to reconstruct Scarborough Beach Road recommenced, and were completed to schedule by May 2010.
Edzub Construction and Engineering‘s traffic management expertise was a key factor in the award of this project, with the sheer mass of pedestrians traffic traversing the site area heightening safety concerns.
As a result, Edzub Construction and Engineering’s extensive track record delivering works of a similar nature ensured the project was delivered safely and to schedule.